Software Testing Training by Experts

;

Our Training Process

Software Testing - Syllabus, Fees & Duration

MODULE 1

  • Software development life cycle
  • SDLC development models
  • Water fall model
  • Evolutionary development model
  • Agile model
  • Test driven development
  • Scrum model

MODULE 2

  • Types of automation
  • Unit test, integration, system testing
  • GUL testing, API testing, load testing
  • Smoke /sanity testing importance
  • Regression/ Functional testing

MODULE 3

  • Uses cases for testers
  • Writing good use cases
  • Elevator, mobile, phone, pen, coffee vending machine
  • List of technologies
  • Black box test technology
  • Boundary value analysis
  • Equivalence class partition
  • Error guessing
  • White box test technology
  • Statement coverage
  • Condition coverage
  • Path coverage
  • Branch coverage
  • Types of test cases
  • Positive and negative cases
  • UI test cases
  • Usability test cases
  • Field validation
  • Functional test cases

MODULE 4

  • Test plan document
  • Title
  • Revision history
  • Objective of document
  • Scope of document
  • Objective of testing
  • Metric collection
  • Project description
  • Critical functionality
  • Test data requirement
  • Features not to be used
  • Test environment
  • Training requirements
  • Effort estimation
  • Resource requirement
  • Scheduling
  • Test strategy
  • Input/ entry criteria
  • Exit criteria
  • Test suspension and resumption criteria
  • Test completion criteria
  • Acceptance criteria
  • Bug classification
  • Test deliverables
  • Standards to be followed
  • Risk analysis

MODULE 5

  • Bugs
  • Bug classifications
  • Bug template
  • Bug tracking
  • Bug tracking tools
  • Bug life cycle
  • Statues for bug life cycle

MODULE 6

  • JAVA
  • OO concepts
  • Encapsulation
  • Inheritance
  • Abstract classes, interface, final
  • Polymorphism
  • Overriding, overloading, this, super, constructor
  • General
  • Collection
  • Lists, sets, revise basic algorithms if time permits
  • Exception handling
  • JDBC

MODULE 7

  • Log4J
  • ANT
  • SVN
  • HUDSON
  • JIRA, Bugzilla
  • JUNIT, Test NG
  • Other languages
  • SQL
  • PERL
  • UNIX

MODULE 8

  • Mercury quick test pro
  • Introduction
  • Recording
  • Object repository
  • Standard checkpoints
  • Database checkpoints need to look
  • Parameterization
  • Data drove testing
  • Output values
  • Actions
  • Descriptive programming

MODULE 9

  • Load testing (load runner)
  • Fundamentals of load runner
  • Planning an effective load test
  • Load runner installation
  • Virtual user generator scripting
  • Recording and playback
  • Action and transactions
  • Parameters, checkpoints correlation
  • Advanced correlation
  • Enhance V user output log
  • Error handling
  • Introduction to scenarios
  • Using run-time setting
  • Scenarios execution
  • Scheduling scenarios
  • Performance monitors
  • Result analysis
  • Building effective load test scripts
  • Load runner hand on exercises

MODULE 10

  • Test management tools
  • Adding test requirements
  • Create tests
  • Executing test case manually
  • Analyze project progress
  • Run tests and analyze the results
  • Report and trace defects
  • Document generator
  • Executing test scripts remotely and more
  • The test case with requirements
  • Descriptive programming

MODULE 11

  • Manual testing real project
  • Take a real project and do the following in different phases of the QA lifecycle
  • QA basic
  • Requirement
  • Test plan
  • Sizing
  • Test case
  • Bug lifecycle
  • Log- with log4j
  • Build
  • Boundary value analysis and equivalence partitioning
  • End and end testing
  • Status reporting
  • UAT
  • Production check out

MODULE 12

  • OR
  • SOR
  • Basic of web syntax
  • Descriptive programing
  • Functions
  • Functional library
  • Excel integration
  • Option explicit
  • Loop
  • Original identifier
  • Get TO property
  • Get RO property
  • Showing manual test script
  • Error handling using script
  • Recovery scenario
  • Download Syllabus - Software Testing (Automation)

MODULE 1

  • What is Software testing?
  • Importance of Software testing
  • How to conduct Software testing.
  • Basic terminology of Software testing
  • Manual Testing Process
  • Difference between Manual and Automated Testing
  • Software testing Roles and Responsibilities

MODULE 2

  • Software development life cycle and various SDLC Models
  • Requirements phase
  • Analysis phase
  • Design phase
  • Coding phase
  • Testing phase
  • Release and maintenance phase
  • Software Development life cycle models
  • Waterfall model
  • Drawbacks of waterfall model
  • Spiral model
  • V model
  • Big bang model
  • RAD model
  • Interactive model

MODULE 3

  • Software test design techniques
  • Static test design
  • Informal reviews
  • Walkthroughs
  • Technical review
  • Inspection
  • Dynamic test design
  • White-box testing
  • Black box testing
  • Grey box testing

MODULE 4

  • Testing levels
  • Functional level
  • Unit testing
  • Integration testing
  • System testing
  • Regression testing
  • Acceptance testing
  • Non-functional
  • Performance testing
  • Load testing
  • Security testing
  • Portability testing

MODULE 5

Course Fees
10000+
20+
50+
25+

Software Testing Jobs in Whitehorse

Enjoy the demand

Find jobs related to Software Testing in search engines (Google, Bing, Yahoo) and recruitment websites (monsterindia, placementindia, naukri, jobsNEAR.in, indeed.co.in, shine.com etc.) based in Whitehorse, chennai and europe countries. You can find many jobs for freshers related to the job positions in Whitehorse.

  • Manual tester
  • Software Test Engineer
  • Test engineer
  • Software Testing
  • Software Automation Testing
  • Quality Assurance Engineer
  • Software Manual Tester
  • Software Testing Analyst
  • Quality Engineer
  • Software Tester

Software Testing Internship/Course Details

Software Testing internship jobs in Whitehorse
Software Testing This allows users to try a variety of desktop, web, and mobile apps. Beginners, intermediates, and specialists can use the software testing automation. The course ensures that you will be placed in an IT company 100 percent of the time. Manual testing consumes a considerable amount of human resources, is expensive in the near term, and takes a long time. . To begin with, the software aids in the reduction of testing costs and execution time. Learning and adopting new technology is driving the expansion of automated testing training from Whitehorse. With live projects, the course covers manual testing from the basics to the advanced level. Increase the testing speed. Our course has a one-of-a-kind syllabus, including a master's degree in manual testing and a 100% placement rate in the field.

List of All Courses & Internship by TechnoMaster

Success Stories

The enviable salary packages and track record of our previous students are the proof of our excellence. Please go through our students' reviews about our training methods and faculty and compare it to the recorded video classes that most of the other institutes offer. See for yourself how TechnoMaster is truly unique.

List of Training Institutes / Companies in Whitehorse

 courses in Whitehorse
Samuel Steele of the North-West Mounted Police said: "why greater casualties have now no longer came about is a thriller to me. [11] In 1920 the primary planes landed in Whitehorse and the primary air mail turned into despatched in November 1927. On April 1, 1953, the metropolis turned into unique the capital of the Yukon Territory whilst the seat turned into moved from Dawson City after the development of the Klondike Highway. Early prospectors used the Chilkoot Pass, however through July 1897, crowds of neophyte stampeders had arrived through steamship and had been tenting at "White Horse". [13] Geography Whitehorse sits at the Yukon River, placed at the bottom of 3 close by mountains; Grey Mountain to the east, Mount Sumanik to the northwest, and Golden Horn Mountain to the south. Before the Gold Rush, numerous distinct tribes handed thru the region seasonally and their territories overlapped. The first copper claims had been staked through Jack McIntyre on July 6, 1898, and Sam McGee on July 16, 1899. By 1901, the Whitehorse Star turned into already reporting on day by day freight volumes. The metropolis limits gift a close to square form oriented in a NW-SE direction. The metropolis turned into named after the White Horse Rapids for his or her resemblance to the mane of a white horse, close to Miles Canyon, earlier than the river turned into dammed.

Trained more than 10000+ students who trust Nestsoft TechnoMaster

Get Your Personal Trainer